The project consisted of the realization of a monitoring and control system for the neutralization process and included:
- design
- mounting (in own workshop)
- supply
- installation
- commissioning
- testing
The electrical command and control cabinet allowed the beneficiary to perform the on-line monitoring and control of the entire process: starting/stopping pumps, opening and closing of the valves, display sensors values for pH, conductivity, level, etc., process control and monitoring based on the sensors values, transfer between tanks, tanks drainage systems, filtration systems etc.